Each item is a calendar-change node (spec §7.1): every reform, era change, or renaming is its own node, linked into a lineage. Dates shown exactly as the source states them; converted day numbers arrive with the Phase 2 alignment layer.
Legend: era change structural reform renaming (the AD → CE chain)